0407 911 693 HAYDN hbarkerplumbing@gmail.com
Excavation Red Hill

Excavation Red Hill

Excavation Red Hill Water was seeping up through the ground in an arena on the side of a hill A trench was dug on 3 sides 2.5 m at deepest point and filled with rock to form a cut off...